Marginal costs and revenues for Amtrak trains

With the release of the combined FY2014 Budget and Business Plan, FY2015 Budget Request Justification, and FY2014 – 2018 Five Year Financial Plan by Amtrak, we're able to gain a little insight into the marginal expenses of running Amtrak trains according to whether they are long distance, state supported corridor trains, or part of the Northeast Corridor. This counts only fuel, T&E and OBS crew and labor, host railroad maintenance of way, host railroad performance incentives, commissary, car and locomotive maintenance and turnaround, and maintenance of way support. These figures can be found on pages 54 (for NEC), 61 (for state supported corridors), and 69 (for long distance trains). Train mile figures are in the appendix, pages 79-80. It goes without saying that calculations based on these figures are of necessity somewhat crude. These numbers do not, of course, account for expenses which are marginal at the level of the route itself, such as stations, nor for maintenance of engineering support or other such costs.


Train miles Marginal cost per train mile Fuel and power T&E crew labor OBS crew labor and support Host RR MoW Host RR performance incentives Commissary provisions and management Car & Locomotive Maintenance and Turnaround MoW support
Long distance
14,451,000
$47.08
$142,600,000
$136,300,000
$119,900,000
$42,400,000
$14,000,000
$58,400,000
$129,200,000
$37,500,000



$9.87
$9.43
$8.30
$2.93
$0.97
$4.04
$8.94
$2.59
Northeast Corridor
9,042,000
$45.05
$55,300,000
$81,400,000
$24,800,000
$2,700,000
$800,000
$23,600,000
$125,100,000
$93,600,000



$6.12
$9.00
$2.74
$0.30
$0.09
$2.61
$13.84
$10.35
State supported
14,461,000
$30.74
$76,500,000
$120,100,000
$27,300,000
$35,500,000
$28,800,000
$14,600,000
$103,400,000
$38,300,000



$5.29
$8.31
$1.89
$2.45
$1.99
$1.01
$7.15
$2.65


It is completely unsurprising that the long distance trains have a vastly increased onboard services cost compared to the other train services. Staffing on the Northeast Corridor trains is minimal, with only a single OBS crew member on most trains, and not all state supported trains have jobs for OBS personnel. This is in stark contrast to the long distance trains which generally operate with ten or more such crew, except for the Palmetto. Nor is it surprising that the Northeast Corridor, filled with various tunnels, bridges, and half a century of deferred maintenance, has significantly increased maintenance of way expenses. What is surprising is that the fuel cost of the Northeast Corridor, running on rather cheap electricity, is still higher than state supported trains. However, we know that Amtrak's current trains in the Northeast Corridor are incredibly energy inefficient and one source notes that "the very bad aerodynamics of the Amtrak high speed trains (one AEM-7 locomotive with six Amfleet coaches) means that, at higher speeds, the TGV or X-2000 (Swedish technology) actually use half or less the energy per p-km used by Amtrak in their Northeast Corridor" (page 25). With the introduction of the ACS-64 and the NextGen HSR trains, we should see a more appropriate fuel and power cost for the Northeast Corridor.

A grain of salt should be taken when looking at the fuel & power and car & locomotive maintenance figures for the long distance trains; these numbers will be slightly skewed upwards by the Auto Train carrying a lengthy consist consisting mainly of freight cars. Somewhat surprisingly, state supported train costs appear to be lower than those for Metrolink's commuter rail, despite the fact that the Metrolink costs did not include maintenance of way expenses. This may be due to higher operational costs from Metrolink's dispatching center, costs that were not offset in that calculation by the appropriate revenues from freight and Amtrak, as well as the fact that Metrolink has a significantly higher fuel cost. The failure prone old age of the locomotives may also be a major contribution to the higher cost.

With a view of the marginal costs, one that is admittedly quite rough, we can look to the question of which, if any, trains cover their marginal costs. Those trains which cover their marginal costs of operation benefit from increased frequencies since they will help bring down the total required subsidy. This is not to say that routes below that number do not benefit from increased frequencies or that they should not be subsidized (though subsidization expenses should not exceed the social benefits).

Unfortunately, Amtrak does not provide a breakdown of train miles by route, only by the business segment. Thankfully the FRA does provide those numbers, though only to the extent of the nearest ten thousand train-miles. These figures are available in the Quarterly Rail Service Metrics and Performance Reports, specifically in Table 11, located on page 16. Using these figures and Amtrak's 2013 ticket revenue figures, I was able to come up with a rough figure for the revenue of each Amtrak route per train mile.


Revenue per train mile Ticket revenue Train miles
Acela
$159.89
$530,820,821
3,320,000




Northeast Regional
$109.34
$613,406,155
5,610,000
—Richmond/Newport News
$20.97
$32,916,626
1,570,000
—Lynchburg
$28.65
$11,744,966
410,000
—All Other Northeast Regional
$156.68
$568,744,563
3,630,000




New York-Albany
$67.12
$44,299,328
660,000
Pacific Surfliner
$39.36
$62,576,548
1,590,000
Carolinian
$38.16
$19,841,847
520,000
Hiawatha
$37.88
$16,287,184
430,000
Pennsylvanian
$32.60
$10,431,324
320,000
Keystone
$32.34
$44,299,328
1,370,000
Cascades
$31.14
$29,269,205
940,000
San Joaquins
$29.19
$39,401,591
1,350,000
Wolverine
$28.95
$19,398,853
670,000
Pere Marquette
$26.27
$3,152,828
120,000
Adirondack
$26.06
$7,035,147
270,000
Blue Water
$25.95
$6,228,730
240,000
Capitol Corridor
$24.09
$27,699,783
1,150,000
Maple Leaf
$23.56
$23,796,560
1,010,000
Illini/Saluki
$21.73
$9,562,149
440,000
Lincoln Service
$20.23
$16,382,439
810,000
Downeaster
$17.85
$8,211,723
460,000
Ethan Allen Express
$16.62
$2,825,134
170,000
Carl Sandburg/Illinois Zephyr
$15.64
$5,788,619
370,000
Kansas City-St. Louis
$14.04
$5,617,913
400,000
Piedmont
$13.86
$3,325,948
240,000
Heartland Flyer
$12.64
$2,022,956
160,000
Vermonter
$11.43
$5,029,712
440,000
Hoosier State
$11.16
$892,553
80,000
New York-Niagara Falls
$0.00

670,000




Auto Train
$111.37
$73,505,625
660,000
Coast Starlight
$41.95
$42,786,995
1,020,000
Lake Shore Limited
$39.66
$32,919,676
830,000
Silver Meteor
$38.78
$39,558,152
1,020,000
Capitol Limited
$37.50
$21,373,833
570,000
Empire Builder
$36.23
$67,394,779
1,860,000
Crescent
$32.89
$32,233,213
980,000
Silver Star
$31.57
$34,095,273
1,080,000
City of New Orleans
$31.53
$21,440,868
680,000
Texas Eagle
$29.73
$27,650,161
930,000
Palmetto
$29.39
$17,929,176
610,000
California Zephyr
$28.01
$49,864,217
1,780,000
Southwest Chief
$27.02
$45,129,813
1,670,000
Cardinal
$21.48
$7,733,458
360,000
Sunset Limited
$19.18
$12,275,400
640,000



A few explanatory notes are in order. First, the Springfield-New Haven Shuttles are not counted because I could find no separate figure for their train miles in the FRA data. It's possible that they are included with the Northeast Regionals, but, lacking knowledge, I excluded their revenue. Second, though the FRA includes all of the train miles for the Amtrak Virginia trains, such as from Lynchburg to Boston, Amtrak only counts the revenue from passengers who board or depart in Virginia; their actual performance is better than this indicates. Third, some non-Regional trains on the NEC, such as the Vermonter, have their revenue, expenses, and passenger numbers accounted for as Regionals until they leave the NEC; while a perfectly legitimate accounting measure, if their train-miles as reported to the FRA are not similarly adjusted, they will appear worse than reality. Finally, Empire Service trains to Buffalo apparently have their revenue counted under the Maple Leaf; I have added their train miles to those of the Maple Leaf's as a result.

It's worth noting that though the Northeast Corridor and several state supported trains cover their marginal costs of operation, the long distance trains do not, with the probable exception of the Auto Train. The Starlight comes the closest, but has additional expenses relating to the Pacific Parlour Car, I expect that the Lake Shore Limited comes the closest to meeting its actual marginal costs, rather than the rough estimate I can provide. It is also completely unsurprising that the California Zephyr, Southwest Chief, and Sunset Limited do as terribly as they do. While the other long distance trains have a variety of solid markets that they are able to serve across a significant portion of their route, frequently at either end, and many sharing that route with multiple other trains (Starlight with Surfliner, Capitol Corridor, and Cascades; Texas Eagle with Lincoln Service, etc.), these particular trains just have a whole heap of nothing for most of their routes, nothing that is often served at poor times as well, contributing to an outsized percentage of riders who take the trains from end point to end point.

Tuesday, March 18, 2014

Amtrak refuses to subsidize the long distance trains any longer

In today’s release of Amtrak’s grant request for Fiscal Year 2015, President Joseph Boardman notes that, if Amtrak were to continue using revenues from the Northeast Corridor to subsidize the rest of the national train system, the resultant operating grant would be only $333 million, the lowest operating subsidy for Amtrak, in real dollars, since 1973. Yet this is not to be. In a major departure from previous practice, Amtrak is reinvesting the operating profits of the Northeast Corridor back into itself as capital investment and demanding that Congress foot the whole bill for the remainder of the national train system, a bill which is almost entirely composed of the long distance train system.

In terms of numbers, there’s little to no real difference as to whether Amtrak is requesting funds as part of an operating grant or as a capital grant; either way the total request for FY15 comes out to $1,620 million dollars. However, it marks a major difference in Amtrak’s political priorities and its strength versus Congress. Previously, Amtrak has always sought to minimize its operating loss, both for practical and political reasons. Maintenance can be deferred for decades, as the Northeast Corridor bears witness, while operational spending cannot; when funding is on the line, it is the immediate needs of operations which needs to come first. Furthermore, it may be a good deal simpler to pass a capital grant, which may slide under the radar so to speak, than it would be to pass what would otherwise be a larger operational grant.

That Amtrak is now willing to demand that Congress fund the entire cost of the national train system, rather than use revenues from the Northeast Corridor to cross-subsidize it, indicates that they are no longer operating under circumstances where they fear having to fight for every single operational dollar. Improvements in the Northeast Corridor, especially the Acela trains, and legislation which moved the burden of funding short distance routes to the host states, have greatly reduced Amtrak’s financial risk outside of the long distance train network. Indeed, the perennial argument by rail advocates that the long distance trains are necessary in order to maintain political patronage in Congress is no longer valid. If the long distance trains are a sop to Congress, then, in the apparent opinion of Amtrak, it is Congress’ responsibility to provide for them, for it no longer requires them to drum up support to continue Amtrak’s survival. It would be a grim sort of survival, with a continued lack of necessary investment in the Northeast Corridor, but even a completely hostile Congress and Presidency can no longer kill Amtrak; they can only kill the long distance trains.

It is also a recognition that Amtrak must come to grips with the investment needs of the Northeast Corridor sooner, rather than later, and that it cannot rely on a major investment by the Federal government to do so. The operational revenues of the Northeast Corridor, if nothing else, represent a somewhat steady source of income for capital investment. As we’ve seen for the past several years, Congress most certainly does not represent anything that might be described as “steady” nor has it been willing to make the large investments necessary to restore the Northeast Corridor to a state of good repair. Make no mistake, those are massive investments that Amtrak will be making. While the FY15 grant request is only for a total of $735 million in capital spending in the Northeast Corridor ($290 million of which will come from operational profits from the Northeast Corridor), Amtrak forecasts an investment of $1,573 million the next year, $1,692 million in Fiscal Year 2017, and $1,650 in Fiscal Year 2018. For comparison, this is larger than the capital investments of Canadian Pacific, Canadian National, and Kansas City Southern.

It is highly likely, however, that the Federal government will balk at clearly subsidizing the long distance trains. With a combined annual operational and capital subsidy just over $900 million, the demand by Amtrak that Congress clearly pay for the long distance trains will encounter a severe amount of resistance, especially with a Tea Party dominated Republican Party remaining in control of the House through the end of the year and probably past the election as well. Even if funding is granted, it will probably be at a reduced level and we may see route eliminations by legislative fiat. This is not altogether a bad thing; the equipment used on an eliminated route may be spread to other routes where it will perform better and reduce the overall operating deficit of the long distance train network.

To this natural resistance must be added the resistance from lobbying by the various rail advocacy organizations. Especially in states where the rail advocates have not had any success in increasing state funded rail service, I would anticipate a vociferous response against Amtrak’s proposal. Yet it is precisely the irrelevance of these organizations and their grandiose, yet completely impractical, “visions for the future” which will allow Amtrak to prevail on the merits of their plan. I do not think that it is altogether coincidental that it is by approximately nine hundred million dollars that Amtrak proposes to increase capital spending on the Northeast Corridor; they do not need to explicitly state where it is that funds may be found by a parsimonious Congress for increased investment in the Northeast Corridor.

I do not think it likely that the entire long distance train network will be dismantled. Certain routes will and some of them, such as the Sunset Limited, truly deserve a cheerful “Good riddance!” should they be so eliminated. Others, however, will continue to have sufficient patronage as to ensure Federal political support or even some state support. The Coast Starlight, for instance, would probably find itself kept, perhaps in an altered form, by the West Coast. Similarly, the Silver Service trains can probably find themselves assured of continued Federal largesse, possibly with some level of state matching funds.

However, it is quite clear that Amtrak will no longer subsidize these trains on its own and that the provision of long distance intercity rail service, if it is to be a Federal goal, must be a mandate entirely funded by the Federal government. For all the complaints that certain rail advocates may make, Amtrak cannot ignore its responsibilities as owner of the Northeast Corridor. Meanwhile, though Amtrak is a national train service, there is nothing that requires that it provide continuous rail service across the entire nation or, at its own expense, to provide rural transportation for disadvantaged communities. The gauntlet has been thrown down and we shall see if Congress truly believes that the long distance train network is worth the expense that it has laid upon Amtrak.

Saturday, February 1, 2014

Acela II is the path towards Amtrak operational self-sustainability

The Northeast Corridor, stretching from Boston to Washington D.C., has traditionally been Amtrak’s greatest revenue sector. Within the Corridor, it has been the premium higher speed services, starting with the Metroliners and continuing on to the current Acela trains, which have been the only Amtrak trains to consistently earn more revenue than it cost to run them. Last year, FY2013, the Acela carried 3,343,143 passengers for a total revenue of $542.7 million, an average of $162.33 per passenger. It took $297.3 million to operate the service, leading to a $236.9 million operational surplus; reducing Amtrak’s operational loss for the year by a third.

The forthcoming Acela II isn’t just supposed to be significantly faster than the current Acela service, cutting 24 minutes from the scheduled time between Washington and New York and 38 minutes between Washington and Boston, but it will also represent a significant boost in capacity. The current Acela trains run with a total of 304 seats, 44 first class seats and the remainder in business class. The “Next Generation Trainset” RFP calls for a nominal total of 425 seats, at least 15% of which are first class. This is a 40% increase in total seating and a 45% increase in the number of first class seats. These are vitally needed seats for Amtrak as one of the largest problems with the Acela is its lack of seating despite heavy demand. At an average of 84 cents per mile in FY2013, fares on the Acela are on a per passenger-mile basis, one of, if not the highest, fares in the world for a high speed train.

With an increase in seating capacity, Amtrak will be able to garner significantly more revenue, even if it lowers the price of Acela seating somewhat. This added revenue comes with no significant increase in operational cost and quite possibly a lowered cost, as there should be a higher rate of availability and lowered mechanical costs for what is essentially an off the shelf train, along with significantly lower energy consumption. With current averages for occupancy and passenger revenue unchanged, an Acela II train service could see $742 million in revenue, with $447 million in operational profit.

This will have an even larger effect upon Amtrak’s financial deficit than initially appears because starting in FY2014, the states bear a greater responsibility for the short distance train corridors. This had the affect of reducing Amtrak’s FY2014 budget request to only $373 million for the operating grant; 2013’s appropriation, by contrast, was $442 million.

Amtrak’s request for proposals provides for a possibly significantly greater increase in capacity and revenue however. Included with the proposals, Amtrak wants a pricing option for delivery of two additional business class cars for each trainset in 2025-2030. If exercised, this would push Acela II onto the edge of being a billion dollar per year service as it would add about 130 seats per train with current Acela business cars as the model. Personally I find myself disappointed that the option is for a delayed delivery rather than for a prompt inclusion with the initial train sets; aside from slightly different wear rates and how that may complicate maintenance, earlier delivery means greater revenue potential for Amtrak.

In addition to greater capacity of the individual trains, three of the four alternatives which Amtrak is requesting information for in the proposals involve additional frequencies of Acela service. The first is perhaps an “if all else fails” alternative, requesting trainsets in order to add peak hour half-hourly service alongside of the current Acela fleet. Somewhat confusingly, it refers to “6 additional Trainsets to operate alongside the existing Acela. Offeror should state the number of Trainsets needed for these additional 6 services.” I believe, but may be mistaken, that this is a poorly worded statement which means that there would be six additional daily frequencies rather than six additional trainsets. Alternative #3 is much the same, except for involving the complete replacement of the Acela fleet (Alternative #2) in addition to the peak-hour half-hourly service. The final alternative asks for sufficient trainsets to operate “the 25 services needed each day outlined in Phase 2 of the Operating Plans,” plans which were not included in the RFP documents unfortunately. Given some of the phrasing in the document, I believe that this refers to 25 trainsets operating each day. With Amtrak operating 16 trainsets per day with the current Acela fleet, this is a major increase (56%) in operating sets and frequencies. While this will increase operating costs, revenue on the Acela is sufficiently high that it is extremely unlikely that the additional frequencies will not positively contribute to Amtrak’s financials.



What the NextGen HSR procurement comes down to is a potentially gigantic increase in premium service availability in the Northeast Corridor. At its most expansive, with 25 operating trainsets each with two additional business class cars, there will be a 185% increase in seat-miles, nearly a tripling, and this is without consideration of whether reduced maintenance requirements (or better maintenance practices) might allow for full weekend service. While this would be unlikely to result in a tripling of revenue, it should still result in a substantial increase in revenues.

In order for Amtrak to completely break even on an operational basis just thanks to the Acela, the operational surplus would need to more than double. While this is perhaps doable, it is unlikely in the near future. What is likely however is a substantial drop in Amtrak’s deficits. This drop in deficits makes makes it easier and more likely to convince Congress and the states along or near the Northeast Corridor to subsidize Amtrak operations, extensions, and capital investment. It also puts Amtrak on a firm path towards breaking free of a reliance upon Federal largesse for its continued existence and with it a more profound freedom to pursue a high quality passenger train network.

A copy of the RFP documents may be found here.