Bad arguments for high speed rail: CO2 emissions

While I am a proponent of high speed rail, not all of the arguments put forth in its favor are valid. One of those arguments is that there is a significant and worthwhile environmental benefit to building high speed rail one which is not merely an added bonus, but rather a good of sufficient value to justify its construction on that ground alone. High speed rail, however, is one of the worst ways to try and reduce CO2 emissions. This is not to deny that there are environmental benefits to high speed rail, but rather to point out that they are simply at the level of added bonus as far as carbon dioxide emissions and climate change (health effects from particulate matter may be a different issue).

The California High Speed Rail Authority claims that, by 2030, using 100% renewable energy, the high speed rail network will reduce carbon dioxide emissions by twelve billion pounds. At 43 billion dollars to construct in year of expenditure dollars, that represents a cost of $3.58 per pound or $7,901 per metric ton of emissions, a far higher level than any proposed carbon tax. Planting additional forests, however, may sequester 2.2-9.5 metric tons of CO2 per acre per year. At the article's suggested ranges of $200-2,000 per acre, 21.5-215 million acres of timber could be planted at the same price, representing 47.3 million metric tons at the extreme low end and more than 2 billion metric tons per year at the extreme high end. Simply shooting for the same goal as CAHSRA claims, 5.4 million metric tons per year, at the lowest sequestration rate and high end of costs, require an investment of 2.45 million acres and 5 billion dollars, nearly an order of magnitude less. In any case, this amounts to an absolutely trivial reduction in CO2 emissions.

An even better investment, however, would be in the phaseout of the generation of electricity using coal power while simultaneously pushing mass transit and low or zero emission privately owned vehicles through tax incentives and subsidies. According to the California Air Resources Board, the largest CO2 emitters in California are oil refineries although they are put to shame by coal power plants. The Jim Bridger Power Plant in Wyoming, which has a net summer capacity of 2,117 megawatts is responsible for 15,293,640 metric tons of CO2 annually. A $13 billion contract was signed in 2008 for two new reactors providing 1,100 MWe each in Georgia, a cost of some 850 dollars per metric ton of carbon emissions reduced if it were used to replace a plant such as the Jim Bridger Power Plant. While solar does not have the problems of nuclear waste, it's low generation capacity relative to nameplate capacity is a severe detriment in comparison to nuclear and coal and makes it a far more expensive alternative. Proper site design, safety procedures, and modern passively cooled reactors make the risk of a meltdown negligible. Therefore, if we were use to the same amount of money for the high speed rail system as for replacing coal power generation, we could reduce CO2 emissions by 50 million metric tons per year, a far higher amount than CAHSR.

All this is not to deny that there is some environmental benefit to high speed rail. But high speed rail is not the proper or cost-effective means of combatting pollution, especially not with regards to CO2 emissions. High speed rail backers should be wary of making claims that the system is worth the expense because of its environmental benefits when those benefits, when extrapolated to an actual financial cost, offset only a small fraction of the cost of the system.

High speed rail operational surplus

Examples from across the world of high speed rail systems posting an operational surplus.

Revenue: 7.2 billion euros
Gross profit: 915 million euros
Operating income: 535 million euros

It should be noted that, although owned by the government, SNCF pays taxes on its income and annual tolls of 1.306 billion euros for the TGV to Réseau Ferré de France, the owner of the French rail network, and 3.6 billion euros in total from other rail operations.

SNCF (France) 2011, page 14
Revenue: 7,279 million euros
Gross profit: 1020 million euros
Operating profit: 581 million euros

Renfe (Spain) 2008, pages 163-164
Revenue: 1.067 billion euros
EBITDA: 146.05 million euros
EBIT: 25.94 million euros
Net income: -24.84 million euros

Renfe (Spain) 2009, pages 154-155
Revenue: 2,142.24 million euros
EBITDA: 257.89 million euros
EBIT: -36.37 million euros
Net income: 13.11 million euros

Renfe (Spain) 2010, pages 154-155
Revenue: 2,161.09 million euros
EBITDA: 270.65 million euros
EBIT: -4.77 million euros
Net income: 46.20 million euros

Although the total income is slightly negative, that is including depreciation. Even with 264 million euros paid to Administrador de Infraestructuras Ferroviarias, the Spanish rail network owner and operator, for trackage rights, the AVE system garners sufficient ticket revenue to pay for the operation of the system.

The 2008 numbers are not comparable with others. In 2010, Renfe merged all of its passenger services into one department, the numbers here include all ticket revenue for commuters and other trains as well plus subsidies for these services (382.98 million euros in 2009, 366.68 million in 2010)

Revenue: 3.565 billion euros
EBITDA: 504 million euros
EBIT: 141 million Euros

Sales: 3.356 billion euros
Profit from ordinary activities: 155 million euros

In the case of the 2010 report, my figures may be flawed since I do not read German, despite two years of college German classes.

DB Bahn Long-Distance business unit (Germany) 2011
Revenue: 1,825 million euros
EBITDA: 227 million euros
EBIT: 40 million euros

Transportation operating revenue: 1,142,369 million yen
Transportation operating expense: 870,358 million yen
Transportation operating income: 272,011 million yen

This includes revenue and expenses from both Shinkansen high speed rail and conventional rail systems. Shinkansen revenue amounted to 973.7 billion yen in FY 2009, indicating that it is fully capable of funding itself.

Railway operating revenues: 806,834 million yen
Railway operating expenses: 745,789 million yen
Railway operating income: 61,044 million yen

Page 27 of this document breaks down transportation revenue by rail line. The Shinkansen is responsible for 323.9 billion yen and conventional lines 404 billion yen. According to page 26, pure ticket sales amounted to 728 billion yen, and operating expenses excluding taxes, depreciation, and rental payments came to 568.7 billion yen.

Transportation operating revenues: 1,808,704 million yen
Transportation costs and expenses: 1,577,378 million yen
Transportation operating income: 231,326 million yen

It should be noted that JR East was severely affected by the Great East Japanese Earthquake on March 11, 2011. Revenue and operating income amounted to 1,772,493 million yen and 227,150 million yen respectively, with expenses not given. Page 33 breaks down totals between Shinkansen and conventional rail with 431.5 billion yen (2011) for Shinkansen and 1,177.5 billion yen for conventional rail.

Acela revenue: 449.9 million USD
Acela costs including OPEBs: 349.3 million USD
Acela fully allocated contribution: 100.6 million USD

Acela is the only high speed line in America, briefly reaching a top speed of 150 miles per hour, although it is limited to lower speeds along most of its route (for instance, a top speed of only 135 miles per hour between Washington D.C. and New York City).

2009 Operating income: NT$23,323,712,000
2009 Operating profit: NT$5,564,846,000
2010 Operating income: NT$27,635,351,000
2010 Operating profit: NT$9,071,545,000

It should be noted that 2009 was the first year in which the Taiwanese high speed rail system covered its operational costs, having begun operations in 2007. Even though it ran at an operational profit, high depreciation charges and high interest costs resulted in a net loss until the government took over the system. High speed rail is not necessarily capable of covering its capital costs on ticket revenue alone without government backing in some manner (at the very least, government backing of loans for lower interest rates).

Edit: For clarification purposes, I should note that JR Kyushu and Korail are not listed because I could not find data for them and SNCB does not appear to break out their data between regular travel and high speed rail. Anyone else not listed, I simply didn't look for. Taiwan HSR was added on June 10, 2011. Spanish 2009-2010, German and French 2011 added on April 14, 2012.

Saturday, May 28, 2011

Opening up the NEC to private operators

Amtrak could lose Northeast line

WASHINGTON -- Congress would take away Amtrak's popular Northeast corridor train service and invite private investors to bid for the right to develop high-speed rail under a plan outlined by a key House Republican on Thursday.

The densely populated corridor -- which extends from Washington to Boston, including service to New York City and Philadelphia -- is the most viable region in the country for truly high-speed trains averaging speeds better than 110 mph, House Transportation and Infrastructure Committee Chairman John Mica, R-Fla., said.

But Amtrak has failed to provide fast service despite tens of billions of dollars in federal aid, he said while outlining his plan at a hearing.

Amtrak's Acela trains reach speeds over 150 mph in some portions of the corridor. Mica said trip times average only 83 mph between Washington and New York and 72 mph between New York and Boston.

His calculations include wait times at station stops along the route, which lowers the average speed. Some trains in Europe and Asia achieve speeds over 200 mph.

Last year, Amtrak proposed a plan to upgrade its Northeast corridor track and trains and to eliminate bottlenecks so that trains can travel up to 220 mph. Trip time between Washington and New York would be reduced to 96 minutes and between New York and Boston to 93 minutes.

The plan would be phased in over 30 years and cost $117 billion to implement. The railroad is seeking private investment to pay for some of the cost.

Mica, a longtime Amtrak critic, wants to take away the rail company's 363 miles of track and infrastructure, place it under the control of the Transportation Department or a new government-created corporation, and solicit bids from private investors for the development, operation and maintenance of high speed service.

The plan will be incorporated in a long-term transportation spending bill the committee is drafting and expects to introduce around mid-June, Mica said.

"I believe that we have great potential in the Northeast corridor," Mica said. "The only thing standing in the way is Amtrak or the federal government or Congress."

Rep. John Duncan, R-Tenn., chairman of the House Transportation highway subcommittee, said Mica's plan probably has enough support from Republicans to pass the House, but it is unlikely to be accepted by the Senate.

Sen. Frank Lautenberg, D-N.J., a leading Amtrak supporter, warned in testimony at the hearing that potential Northeast corridor investors will want a profit, which means ticket prices likely would increase.

Mica's plan "hasn't begun to get any legs to stand on as I see it," he told reporters afterward. He said the plan would amount to a "death potion" for the transportation spending bill, which pays for highway and transit construction.

Amtrak is a private corporation, but it depends on federal subsidies. Amtrak is in debt to the federal government for about $4 billion, according to a committee briefing memo. Amtrak spokesman Steve Kulm said the railroad had paid off about half the debt as of last year.

Amtrak was created by Congress in 1971 to provide passenger train service between cities after passenger railroads failed in the face of competition from airlines and interstate highway travel. But with the U.S. population expected to exceed 400 million people by 2050, nightmarish congestion is forecast for the nation's already crowded highways and airports.

President Barack Obama has said he wants to put high-speed intercity trains within reach of 80 percent of the American public by 2025, but he has run up against resistance from Republican governors and members of Congress who say the nation can't afford the cost.

Quite frankly, this is a reasonably good idea, as long as it is handled well (for instance, by mandating that whatever private organization receives the NEC makes certain improvements, ie regular service between NYC and Washington, D.C. within two hours, upon pain of severe penalties and revocation of franchise). Amtrak's handling of the NEC has been extremely poor, their plans quite frankly incompetent, and any improvements by Amtrak would be at taxpayer expense.

Monday, May 23, 2011

Increasing the revenue potential of HSR

While the focus of high speed rail is on passenger movement (with only the TGV La Poste providing freight movement amongst all the world's high speed rail lines), the potential for freight traffic should not be overlooked as well. Not only does the diversion of freight from road to rail relieve congestion, pollution, and road damage, but rail freight is also a valuable source of revenue, potentially exceeding that from passenger travel, which increases the viability of the rail system and enhances its ability to self-fund improvements and expansions. As a result, this particular information regarding San Diego freight traffic is particularly interesting:

How significant is the need for a larger airport in San Diego County? And what is wrong with Lindbergh, the current airport?

There is significant need for new airport capacity today, not 15 years from now. Two-thirds of San Diego’s air cargo is currently trucked up to LAX and Ontario airports. Thirty percent of our passengers go outside the county, primarily to LAX, for long-haul and international flights. Lindbergh is a lovely short-haul airport—if you want to go to the Bay Area, Las Vegas, or Sacramento.

But, at only 600-plus acres, Lindbergh is far too constrained for full long-haul, international, and air cargo service. And there are no other currently available sites in the county for a new airport. Of all possible sites, the best one remains Miramar, which is in military hands and isn’t likely to be turned into a civilian airport any time soon.

With 127,261 tons of cargo in 2010, we can see that comes out to approximately 250,000 tons of freight, in loads easily manageable by high speed rail vehicles. As the current plan envisions a stop at Ontario Airport and San Diego is proposing an intermodal hub at Lindbergh field itself, intermodal freight shipments between San Diego and Ontario Airport could prove to be a valuable service in addition to the passenger traffic along the LA-San Diego line.

Wednesday, May 18, 2011

Overperforming rail lines

Alon Levy at Pedestrian Observations has a good post regarding overperforming rail lines such as Amtrak's new Lynchburg line and what we can learn from them.

Monday, May 9, 2011

OCTA authorizes more Metrolink trains within OC

Transit board approves 6 new O.C. Metrolink trains

The Orange County Transportation Authority board approved a scaled-back plan to add six trains between Fullerton and Laguna Niguel, after the agency initially envisioned adding 32 weekday countywide trains.

These trains will operate in the late afternoon and evening beginning this summer, providing service to a previously underserved market, OCTA officials said.

The Orange County Transportation Authority board approved a scaled-back plan to add 6 trains between Fullerton and Laguna Niguel, after the agency initially envisioned adding 32 weekday countywide trains.

The six trains provide a total of 48 daily trains servicing Orange County. An additional six trains could be implemented in fiscal year 2014-15.

The expansion, which was approved by voters as part of the renewed Measure M sales tax ballot initiative in 2006, ultimately envisions bringing the daily total of trains to 76. The overall cost, which includes buying new locomotives and passenger cars as well as making improvements to stations, expanding parking lots, and making street crossings safer, is more than $400 million.

When voters approved the measure, the county was going through a robust economic growth and officials predicted that by 2010, average weekday ridership on the three Metrolink lines that serve Orange County would grow from about 14,000 to more than 30,000.

Then came the recession.

During the past three months of 2010, combined average weekday ridership on the three lines servicing Orange County was 14,093, a decrease of 1.3 percent compared to the same period in fiscal year 2009-10.

Will Kempton, OCTA's CEO, believes that once trains are running more frequently, more people will ride them.

The idea is that, with trains running every half hour or so, "people won't have to worry so much about a schedule," Kempton said in a previous interview. "They can simply go to the station and know that there will be a train."

A $7 intra-county day pass for use on all OCTA local buses and Metrolink service was also approved to correspond with the new service.

Meanwhile, as the OCTA approved this plan, Metrolink launched an express service for passengers who travel on the Antelope Valley and San Bernardino lines. The service is supposed to save daily commuters up to five hours a week by limiting the number of times the trains stop.

"As gas prices continue to increase and transportation funding remains scarce, Metrolink is assuming a bigger role in meeting the region's transportation needs by adding service that provides more solutions for our ridership," said Metrolink CEO John Fenton in a statement.


The OCLink Pass may turn out to be even bigger than the increased Metrolink schedule. One of the larger detractions to ridership on Metrolink is the cost of a ticket. An all day pass for $7, however, is a major reduction in cost, by more than 50% on a round-trip ticket between Laguna Niguel and Fullerton for instance, and a drop to 33% of the normal round-trip fare between the outliers of Buena Park and San Clemente. These ticket prices are lower than parking alone for Angels Stadium or the Honda Center, which are both directly served by Metrolink, which means that, presuming that the schedules have enough trains, especially trains later in the evening, there should be a healthy boost in ridership, especially for the Honda Center, whose parking costs are sufficiently high to make it cheaper to bring multiple people by train rather than drive and park.

Wednesday, May 4, 2011

Why the 241 Toll Road makes the argument for high speed rail

Lately, the Transportation Corridor Agencies, who own and manage CA-241 and certain other toll roads, have been using a new website to promote extending the 241 south. Of note is this particular claim:

Extending the 241 will ease traffic on Interstate 5 by creating an alternative route for the hundreds of thousands of motorists a day who travel between San Diego, Orange and Los Angeles Counties. Without the toll road, travel from the San Diego/Orange County border to Mission Viejo will take one hour in 2025. With the toll road constructed, the same drive on Interstate 5 will take 25 minutes and only 16 minutes on the toll road. The 241 is also expected to take pressure off Interstate 15, currently used by many driving from eastern Orange County into San Diego County. The 241 Toll Road will carry thousands of vehicles that would otherwise be clogging neighborhood streets and Interstate 5.

This is highly interesting and applicable to the high speed rail program and conventional intercity travel for Southern California. Such a level of congestion would make even the current Pacific Surfliner route significantly faster for travel from Orange County to San Diego as well as the high speed rail route (however, travel from Orange County to San Diego is liable to be faster along the current Surfliner route due to the backtracking to Los Angeles and inland route; currently Irvine to San Diego is comparable according to Amtrak schedule and CAHSR Trip Planner, upgrades currently in the works and reasonably foreseen by 2025 would put the Surfliner in the lead).

Given the previous failures of the 241 to extend south, as originally intended, and its lack of actual connection to Mission Viejo, it is doubtful that they will succeed in this current venture, and such high levels of traffic congestion and delays will occur. If, however, Orange and San Diego Counties are able to cooperate on expanding rail service, increasing average speed, and cutting delays, intercity and commuter rail should prosper well and take the place that the 241 cannot.